Toll Free No
+
18001800525
Member Login
Forgot Password?
You are the Visitor No.
hit counter
 
 District  Category  Tender Title.  Tender Date Order By
   
 
 
DistrictCategoryTender NoTender DateTender TitleLast Date Of SaleOpening Date 
Kanpur Nagar 2018-19 1st Qtr (Jan18-Mar18) 100 18/01/2018 Rewinding, Testing & Commissioning of oil type 250 KVA, ABB make Transformer at 12 MLD Main Pumping Station Pata Nala (Ajaypal), Kannauj (Details given in tender document). 22/02/2018 23/02/2018 100.pdf
Pilibhit 2018-19 1st Qtr (Jan18-Mar18) 98 17/01/2018 Installation of New India mark-2 hand pump in rural area of block-bilsanda tehseel- Bisalpur district pilibhit( HP-50Nos) 20/02/2018 22/02/2018 98.pdf
Allahabad 2018-19 1st Qtr (Jan18-Mar18) 14 09/01/2018 Construction & complete development of 160/145 M deep 300x200 mm dia size Tubewells in Mela area under Kumbh Mela 2019 in District Allahabad 20/02/2018 21/02/2018 14.pdf
Moradabad 2018-19 1st Qtr (Jan18-Mar18) 332 19/01/2018 Supply of all materials, labour and T&P for construction of following works as complete in all respect including commissioning, testing, trial run, defect liability and handing over complete works (Turnkey Basis) Rawan Buzurg Villag 19/02/2018 20/02/2018 332.pdf
Agra 2018-19 1st Qtr (Jan18-Mar18) 24 12/01/2018 Constrication of Academic & International Guest House (Sanskriti Bhavan) at Lalit Kala Sansthan,Civil Line Campus, Dr. B.R. Ambedkar Univerisity, Agra 15/02/2018 17/02/2018 24.pdf
Varanasi 2018-19 1st Qtr (Jan18-Mar18) 145 17/01/2018 Corrigendum notice no. 39/Nivida/75 date 06..1.2018 16/02/2018 17/02/2018 145.pdf
Aligarh 2018-19 1st Qtr (Jan18-Mar18) 34 16/01/2018 Design, Supply, Installation, Testing, Commissioning, Operation and 5 year Maintenance of Solar Powered submersible pumping plant capable of delivering 165 KLD at 43 m head complete with accessories in all respect for Amrauli Ratanpur Water Supply Sc 15/02/2018 16/02/2018 34.pdf
Allahabad 2018-19 1st Qtr (Jan18-Mar18) 26 08/01/2018 Supply of over to 1.25 mm to 3.65 mm size pea gravel of Lal Kuwan quarry duly washed, screened and properly stacked at site including transportation up to site of tube well or up to approach available for the loaded truck near to site at different 15/02/2018 16/02/2018 26.pdf
Allahabad 2018-19 1st Qtr (Jan18-Mar18) 13 08/01/2018 Constructin & complete development 160/145 M Deep 300 x 200 mm dia size Tubewells under Kumbh Mela 2019 in district Allahabad 15/02/2018 16/02/2018 13.pdf
Varanasi 2018-19 1st Qtr (Jan18-Mar18) 109 16/01/2018 Survey, Investigation, Design, build opreation and transfer of interception diversion and treatmant 15/02/2018 16/02/2018 NIT 109 dt. 16-01-2018.pdf
Hardoi 2018-19 1st Qtr (Jan18-Mar18) 93 11/01/2018 Installation of India mark II handpump work at district Hardoi 13/02/2018 15/02/2018 93.pdf
Chandauli 2018-19 1st Qtr (Jan18-Mar18) 208 22/01/2018 Installation of india mark II handpump etc 13/02/2018 13/02/2018 208.pdf
Kanpur Nagar 2018-19 1st Qtr (Jan18-Mar18) 141 19/01/2018 Horticulture and Landscaping work at STP campus, Jajmau, Kanpur 13/02/2018 13/02/2018 141.pdf
Kanpur Nagar 2018-19 1st Qtr (Jan18-Mar18) 140 19/01/2018 Renovation/repair of old damaged gas Dome of gas holder No. 1 of 130 mld STP at Jajmau, Kanpur. 13/02/2018 13/02/2018 140.pdf
Kanpur Nagar 2018-19 1st Qtr (Jan18-Mar18) 149 19/01/2018 Construction of Boundary wall required for safety of STP campus Jajmau, Kanpur 13/02/2018 13/02/2018 149.pdf
MAU 2018-19 1st Qtr (Jan18-Mar18) 64 12/01/2018 Supply and installation of 6 nos. Drinking Water ATM in village - Dhadval Patrawn, Block -Fatehpur Mandav Distt- Mau. 12/02/2018 13/02/2018 64.pdf
Unnao 2018-19 1st Qtr (Jan18-Mar18) 12 06/01/2018 Construction of Fire Station Bheeghapur Unnao 12/02/2018 13/02/2018 12.pdf
Basti 2018-19 1st Qtr (Jan18-Mar18) 45 11/01/2018 Soil testing,desigen,supply, construction, testing & trial run of over head tank of 175 KL capicaty, supply, laying and jointing of rising main and distribution system, GADAPUR CHAK GRAM PANCHAYAT WATER SUPPLY SCHEME Dist. Basti 06/02/2018 08/02/2018 45.pdf
Basti 2018-19 1st Qtr (Jan18-Mar18) 44 11/01/2018 Soil testing,desigen,supply, construction, testing & trial run of over head tank of 125 KL capicaty, supply, laying and jointing of rising main and distribution system, boundrywall with gate, pump house, staff quarter District Basti 06/02/2018 08/02/2018 44.pdf
Basti 2018-19 1st Qtr (Jan18-Mar18) 43 11/01/2018 Soil testing,desigen,supply, construction, testing & trial run of over head tank of 200 KL capicaty, supply, laying and jointing of rising main and distribution system, BEILI GRAM PANCHAYAT WATER SUPPLY SCHEME Dist. Basti 06/02/2018 08/02/2018 43.pdf
12345678910...
 
 
Powered by UPDESCO and its Associate M/S MARG Software Solutions.